43,000 tons Heavy Lifting Operation
Our engineers were engaged by Enerpac as Operation leader and Controls Engineer to orchestral the whole lifting, weighing and loadout operation of one of the heaviest steel structure in the world - a 43,000 tons FPS (Floating Platform System) named Gumusut Kakap in MMHE (Malaysia Marine and Heavy Engineering), Malaysia. 352 units of 300tons Enerpac Jacks were deployed for this incredibly huge operation. Our engineers were proud to have been part of this successful operation which also involves several notable companies in the world.





